Question: How to solve A G + 3 RC building is made up of MRFs in both X and Y directions. There are three bays of

How to solve A G +3 RC building is made up of MRFs in both X and Y directions. There are three bays of 6m each in the X-direction and two bays of 5m each in the Ydirection. All columns are 600mm \times 230mm, with the depth of column along Ydirection. All beams are 530mm \times 230mm. A RC shear wall of 230mm is provided in the middle bay along X-direction only in the peripheral frames. Ignore the stiffness of infill masonry walls in the frames. Loads: Imposed loads on floors 4 kN/m2 on floors and 2 kN/m2 on the roof; Dead loads: to be calculated. The grade of concrete used is M25 and grade of steel is Fe500. i) Estimate the earthquake loads as per IS 1893: 2016 if the building is located in zone IV and is founded on clayey soil of intermediate compressibility with SPT =8 ii) Write the assumptions made in the analysis .
calculate mass and stiffness for the above

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!