Question: HW# 0 5 In HW # 0 4 , five barrels of the formation fluid entered the wellbore due to too fast tripping out. If

HW#05
In HW #04, five barrels of the formation fluid entered the wellbore due to too fast tripping out. If the CSIP is 260 psi and the maximum casing pressure when the formation fluid is at the surface is 1,750, use the volumetric method to circulate the kick out.
Note I: Pressure increment and safety factors are 100 and 200 psi , respectively.
Note II: The bit is plugged.
a. Tabulate Casing Pressure (Pcsg) vs. volume of drilling mud bled off quantitatively.
b. Calculate kill mud density if the situation is isothermal.
c. How does the BHP change during the operation?
2. The following surveys were conducted in a deviated wellbore.
\table[[,MD, ft,x,ft,Y,ft,Z,ft,,deg,var,deg
HW#04
We are drilling in the 8.5''-hole section of a vertical well at 11,000ft. The previous casing string (9-58'',47lbsft) was run and cemented at 8,500ft. A kick has been detected. 8 bbls of 11 ppg mud has been gained in the mud pit. The well was shut in and casing pressure was recorded (Table 1). The shut-in drill pipe pressure is 230 psi . The drill string consists of 600ft6-14''DC,93.5lbft, and 5''DP,19.5lbft. Reduced Circulating Pressure (RCP) is 360 psi . The mud pump is a triplex single-acting pump with the following specifications:
Length of liner: 14 inches
Piston diameter: 6 inches
Rod diameter: 2 inches Volumetric efficiency: %97
\table[[Casing Pressure Data],[Time, min,P, psi],[0,0],[1,153]]
\table[[Casing Pressure Data],[Time, min,P, psi],[0,0],[1,153],[2,220],[3,265],[4,298],[5,320],[6,335],[7,346],[8,353],[9,358],[10,363],[11,373],[12,378],[13,383],[14,388],[15,]]
HW#05
In HW #04, five barrels of the formation fluid entered the wellbore due to too fast tripping out. If the CSIP is 260 psi and the maximum casing pressure when the formation fluid is at the surface is 1,750, use the volumetric method to circulate the kick out.
Note I: Pressure increment and safety factors are 100 and 200 psi , respectively.
Note II: The bit is plugged.
a. Tabulate Casing Pressure (Pcsg) vs. volume of drilling mud bled off quantitatively.
b. Calculate kill mud density if the situation is isothermal.
c. How does the BHP change during the operation?
2. The following surveys were conducted in a deviated wellbore.
\table[[,MD, ft,x,ft,Y,ft,Z,ft,,deg,var,deg
HW# 0 5 In HW # 0 4 , five barrels of the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!