Question: HW 2 Develop a preliminary WBS for a small one - story commercial building to be constructed on the site of an existing small -

HW 2
Develop a preliminary WBS for a small one-story commercial building to be constructed on the site of an existing small-frame structure. It is 30 by 60 feet in plan (see illustration). The exterior and interior walls are of concrete block. The rigid insulation, and built-up roofing. The ceiling is suspended acoustical tile. The floor is a concrete slab on grade with an asphalt tile finish. Interior finish on all walls is paint.
a. Show the first level of this structure for the total project (WBS is developed from top to the bottom).
B. Select one work package (or building system) of the first level and develop the second-level structure for this work package.
HW 2 Develop a preliminary WBS for a small one -

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!