Question: HW 5 CIEN 4 0 3 , Foundation Engineering Fall 2 0 2 4 Due Date: 1 1 - 1 1 - 2 0 2

HW5
CIEN403, Foundation Engineering
Fall 2024
Due Date: 11-11-2024
Problem 1:
A 0.5-m-diameter steel pile is driven into dense sand. The pile is driven with the tip closed by a flat plate. The closed-end, steel-pipe pile is filled with concrete after driving. The embedded length of the pile is 20 m . Soil conditions are as shown in Figure 10-30. Determine the design capacity of the pile, using a factor of safety of 2.
FIGURE 10-30