Question: HW. Time-Cost Analysis. find 6 Given the following table, Using 2. methods NT, NC, CT, CC of the project Cost N Time Act. Pred. N

HW. Time-Cost Analysis. find 6 Given the
HW. Time-Cost Analysis. find 6 Given the following table, Using 2. methods NT, NC, CT, CC of the project Cost N Time Act. Pred. N A 10 11 9 150,000 55,00 a lalu B 9 10,000 52 pul C 17 30,000 625,00 60,00 34ous 35,000 D E 8 BD 5 535,000 15 10 45,000 60,000