Question: I GOT QUESTION A CORRECT BUT NEED HELP WITH QUESTION B: Problem 16-12 (Algo) Your company assembles five different models of a motor scooter that

I GOT QUESTION A CORRECT BUT NEED HELP WITH QUESTION B:

Problem 16-12 (Algo)

Your company assembles five different models of a motor scooter that is sold in specialty stores in the United States. The company uses the same engine for all five models. You have been given the assignment of choosing a supplier for these engines for the coming year. Due to the size of your warehouse and other administrative restrictions, you must order the engines in lot sizes of 1,240 units. Because of the unique characteristics of the engine, special tooling is needed during the manufacturing process for which you agree to reimburse the supplier. Your assistant has obtained quotes from two reliable engine suppliers and you need to decide which to use. The following data have been collected:

Requirements (annual forecast) 14,880 units
Weight per engine 25 pounds
Order processing cost $ 190 per order
Inventory carry cost 20 percent of the average value of inventory per year

Note: Assume that half of lot size is in inventory on average (1,240/2 = 620 units).

Two qualified suppliers have submitted the following quotations:

ORDER QUANTITY SUPPLIER 1 UNIT PRICE SUPPLIER 2 UNIT PRICE
1 to 1,499 units/order $ 575 $ 572
1,500 to 2,999 units/order 569 572
3,000 + units/order 568 565
Tooling costs $ 30,100 $ 28,000
Distance 120 miles 100 miles

Your assistant has obtained the following freight rates from your carrier:

Truckload (45,000 lbs. each load): $0.80 per ton-mile
Less-than-truckload: $1.20 per ton-mile

Note: Per ton-mile = 2,000 lbs. per mile.

a-1. Calculate the total cost for each supplier. (Round your answers to the nearest whole number.)

I GOT QUESTION A CORRECT BUT NEED HELP WITH

b-1. If you could move the lot size up to ship in truckload quantities, calculate the total cost for each supplier. (Do not round intermediate calculations. Round "Required lot size for truckload" and final answers to the nearest whole number.)

HINT: Use (full) truckload cost rates and the lowest (feasible) unit cost for all calculations. For example, if there are 8.3 orders per year, dont split the 8.3 orders into 8 full truckloads and 0.3 less-than-truckloads - use the full truckload rate for all 8.3 orders. For annual purchase cost, dont use two different unit costs for the 8 complete orders and the 0.3 partial orders use the lowest (feasible) unit cost for all 8.3 purchase orders based on the lot size needed for a full truckload.

I GOT QUESTION A CORRECT BUT NEED HELP WITH

Answer is complete and correct. Supplier 1 8,686,464 Supplier 2 8,634,888 Total cost $ $ X Answer is complete but not entirely correct. Supplier 1 8,558,427 X $ Supplier 2 8,628,651 Total cost $

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock