Question: I have a fill in the blank question: The single rate allocates all overhead costs based on Per the data you calculated in the preceding
I have a fill in the blank question:

The single rate allocates all overhead costs based on Per the data you calculated in the preceding step, the single rate system assigned to each unit of Job A is % of the overhead cost assigned to each unit of Job B. The activity-based costing system allocates overhead costs based on The data you have calculated in the previous step shows that a unit of actually consumes more of most overhead resources than a unit of . The ABC system recognizes the actual resource consumption. The single rate undercosts and overcosts The activity-based costing system is accurate than the single-rate system in assigning the costs of the resources each job consumes