Question: I need a clear answer please with clear and complete solution steps (1) A small project is composed of 7 Activities, whose Time estimates are

I need a clear answer please with clear and complete solution steps
(1) A small project is composed of 7 Activities, whose Time estimates are listed below. PESSIMESTIC OPTIMISTIC 2 2 4 14 ACTIVITY 1-2 1-3 1-4 2-5 3-5 4-6 5-6 N N S N Ss NOON N 00 N MOST LIKELY 2 8 4 2 10 14 16 2 28 16 30 10 12 1. Calculate the Estimated Durations for each Activity based on PERT equation. 2. Draw the network diagram with the estimated durations 3. Find the critical path/ paths and calculate the critical pathStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock