Question: i need answer e and f please proesss? [LO7-5] f kecrlit Sudies does custom metal sculptures of horses and other animals. A horse culpure is

proesss? [LO7-5] f kecrlit Sudies does custom metal sculptures of horses and other animals. A horse culpure is composed of numerous parts. They use a lathe to construct two types of puts. The "Body" part is used to support the torso of the horse and the "Leg" part is wsed to support the legs. Each horse sculpture needs 1 Body part and 4 Leg parts. syirching between either of the types of parts requires 25 minutes. Once ready to prothe lathe only makes horse parts. For parts (a)-(d) assume Keuka operates a cyclic. The lathede in which they make 100 Body parts and then 400Leg parts. Furthermore, assume the lathe is the bottleneck. Q. What is the maximum number of horse sculptures Keuka can make per hour? [L07-2] Llow iation (\%) of the lathe? [LO7-3] c. Suppose Keuka is demand-constrained and they have 1 worker who is able to assemble a horse sculpture in 16 minutes. What is the average inventory of Body parts? [L07-4] d. Suppose Keuka is demand-constrained and they have 1 worker who is able to assemble a horse sculpture in 16 minutes. What is the average inventory of Legs? [L07-4] e. Suppose Keuka is demand-constrained and they have 1 worker who is able to assemble a horse sculpture in 16 minutes. If Keuka designs a cyclic schedule for the lathe, how many Body parts should they make in each batch so as to minimize inventory while not constraining the flow through assembly? (Do not round your answer to a integer.) [L07-5] f. Suppose Keuka is demand-constrained and they have I worker who is able to 16 minutes, If Keuka designs a syelic schectist. [Lonstrain
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
