Question: I need answer of this question with arena simulation programming. Platoons are deploying to the Middle East at a pace of 10 platoons/day. The USAF's
I need answer of this question with arena simulation programming.


Platoons are deploying to the Middle East at a pace of 10 platoons/day. The USAF's Air Mobility Command is tasked with expediently moving these platoons from their home bases to their deployment locations. The following 17 routes are currently flown by the Air Mobility Command: 3. Fort Bragg 1. Fort 13. BWI Airport 6. Ramstein Campbell AB 9. Manas 2. Fort AB Lewis 7. Lakenheath 10. Bagram 5. Fort AB Dix 12 . Al- 14. NAS 8. Rota AB Udeid AB 11. 4. Fort Norfolk Kandahar Polk Platoons deploy from and to the locations listed below with the given frequency: 10 11 12 To: Manas Bagram Kandahar Al-Udeid 1 Campbell 2% 6% 5% 1% 2 Lewis 3% 4% 5% 2% 3 Bragg 5% 9% 8% 1% 4 Polk 6% 7% 8% 2% 5 Dix 4% 4% 7% 2% 6 Ramstein 1% 1% 0% 2% 7 Lakenheath 1% 0% 0% 2% 8 Rota 0% 1% 0% 1%The AMC inventory is 20 planes: 8 C-5s which can carry three platoons, 7 Rotators which can carry four platoons and 5 C-130s which can carry two platoons. Currently, the AMC is only using 17 planes (one for each route flown), and have 2 additional rotators and 1 additional C-5 that are idle. The types of planes used currently for each route is given below along with the flight times between the bases: Current Flight Roster Flight Times (in hours) 13 14 13 14 to: BWI Norfolk to: BWI Norfolk 1 Campbell C-130 1 Campbell 10 10 2 Lewis C-130 2 Lewis 14 14 3 Bragg C-130 3 Bragg 9 9 4 Polk C-5 Polk 11 11 5 Dix C - 5 5 Dix 9 10 7 8 6 7 8 to: Ramstein Lakenheath Rota to: Ramstein Lakenheath Rota 13 BWI Rotator Rotator 13 BWI 17 16 17 14 Norfolk Rotator Rotator 14 Norfolk 17 17 17 12 9 12 9 to: Al-Udeid Manas to: Al-Udeid Manas 6 Ramstein Rotator C-5 6 Ramstein 15 15 7 Lakenheath C-5 C-5 7 Lakenheath 16 16 8 Rota C-5 C-5 8 Rota 16 18 10 11 9 10 11 to: Manas Bagram Kandahar to: Manas Bagram Kandahar 12 Al-Udeid C-130 C-130 12 Al-Udeid 12 11 11 1) In this model, what are entities? What are their attributes? What are the events? What constitutes the system state? What are the activities? 2)Run the simulation for 800 hours and number of replications is 3
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
