Question: i need answer please Q3 [1 mark] We have a structure that is planned to be appraised in the year 2024. We think it might

i need answer please
i need answer please Q3 [1 mark] We have a
Q3 [1 mark] We have a structure that is planned to be appraised in the year 2024. We think it might contain a STOLIP of 33 MMstb. Recovery factor is assumed to reach 42% achieved through a waterflooding project. Determine the proved oil reserves as of today. Q4 [1 mark) The reserves to production ratio of 'X' country is 99.3 and their annual production is 32 million stock tank barrels of oil. Determine the reserves available in this country. Q5 (1 mark) Calculate the oil formation volume factor given the reservoir volume is 388 million reservoir barrels and the surface volume of fluids is 318 million stock tank barrels. Q6 [1 mark] One of the advantages of Logging While Drilling (LWD) is lowering the effects of mud invasion. What does it mean

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!