Question: I need help doing a Gantt chart. I have never done excel before and I am a slow learner with a disability. Ventura Baseball Stadium
I need help doing a Gantt chart. I have never done excel before and I am a slow learner with a disability.
Ventura Baseball Stadium Part A
The G & E Company is preparing a bid to build the new 47,000-seat Shoreline baseball stadium. The construction must start on June 10, 2019 and be completed in time for the start of the 2022 season. A penalty clause of $500,000 per day of delay beyond April 3rd is written into the contract.
Percival Young, the president of the company, expressed optimism at obtaining the contract and revealed that the company could net as much $5 million on the project. He also said that if they were successful, the prospects of future classic ball parks with modern luxury boxes.

TABLE 6.3 Ventura Baseball Stadium Case ID Activity Duration Predecessor(s) Baseball Stadium Clear stadium site 60 days Demolish building 30 days Set up construction site 30 days UINNNI Drive support piling 120 days 00 -OUT A W Pour lower concrete bowl 120 days 4. 6 Pour main concourse 120 days Install playing field 90 days 4. 6 Construct upper steel bowl 120 days 4. 6 7.9 10 Install seats 140 days 11 Build luxury boxes 90 days 7,9 Install jumbotron 30 days 7,9 12 13 Stadium infrastructure 120 days 7.9 14 Construct steel canopy 75 days 10 15 Light installation 30 days 6 16 Build roof supports 90 days 16 17 Construct roof 180 days 18 90 days 16 Install roof tracks Install roof 17, 18 19 90 days 20 Inspection 20 days 8, 11, 13, 15, 19