Question: I need help formulating a graphicallinear programming model for this problem. Obj Fun Max Z = 5(x1)+13(x2) $ 130.00 x1 x2 Variables Tires Steering Wheels
I need help formulating a graphicallinear programming model for this problem.
| Obj Fun | Max Z = 5(x1)+13(x2) | $ 130.00 | ||||
| x1 | x2 | |||||
| Variables | Tires | Steering Wheels | ||||
| Values | 0 | 10 | ||||
| Profit | $ 5.00 | $ 13.00 | ||||
| Subject to Constraints: | x1 | x2 | Usage | Sign | Limit | |
| Assy 1 | 5 | 4 | 40 | < = | 120 | |
| Assy 2 | 7 | 7 | 70 | < = | 70 | |
|
| ||||||
| JD Automotive Supply produces 2 different products including Tires and Steering Wheels. For every tire sold JD Automotive Supply makes a profit of $5 and for every steering wheel sold they make a profit of $13. The products are produced on 2 different assembly lines. Assembly line 1 has 120 hours available and assemby line 2 has 70 hours available. On assembly line 1, the tires need five hours while the steering wheels only need 4. Both the steering wheels and the tires require 7 hours on the second assembly line. |
|
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts