Question: i need help solving this question Using Johnson's rule for 2-machine scheduling, the sequence is: Six jobs are to be processed through a two-step operation.
i need help solving this question
Using Johnson's rule for 2-machine scheduling, the sequence is: Six jobs are to be processed through a two-step operation. The first operation involves sanding, and the second involves painting. Processing times are as follows: Scheduled Order Job 1 2 Job Operation 1 (hours) 3 lu 4 A B Operation 2 (hours) 4 11 14 2 10 8 5 6 9 3 6 6 E F twc as 1 For the schedule developed using Johnson's rule, the total length of time taken to complete the six jobs (including the 2nd operation) = hours (enter your response as a whole number). mac