Question: I need help with an assignment where I need to rewire a building with category 6 cable, RJ 45 outlets, and patch panels. The floor
I need help with an assignment where I need to rewire a building with category 6 cable, RJ 45 outlets, and patch panels. The floor plan of the building, which you can assume is to scale, is linked. Each office and classroom (these are the rooms that are numbered on the floor plan) will need two data outlets. That means that two cables will need to run to each room, which will be terminated on one end with an RJ 45 outlet and in a patch panel on the other end. Use a star or extended star topology for the wiring. Pick one "equipment room" near the center of the building that will house the core switches and router for the building as well as access cables from nearby classrooms and offices. You will also need "telecomm closets" if the building is so large that any access cable will be more than 90 meters long. All of these rooms will need patch panels for terminating your cable runs. Ensure that the cable run from each of your chosen rooms to the office or classroom that is furthest away is not further than the Cat 6a spec allows (90 meters). The building is 215 feet wide. The ceilings are 10 feet tall. Use a ruler to determine the scale of the diagram and use that scale to estimate the total amount of cable that you will need.
I need help to submit: A diagram of Constant Hall indicating where the equipment room and telecommunication closet(s) should be located. You may use up to 4 small rooms total for these purposes. Because people like windowed offices, the rooms you use must be windowless (not on the outside of the building). Your equipment room must be at least 36 square feet, but telecommunication closets can be as small as 16 square feet.
An estimate of the total amount of cable that will be needed. The simplest way to estimate is to average the shortest and longest cable runs to the equipment room or telecomm closet, then multiply that by the number of cables running to that room. Show the assumptions that you used about the horizontal and vertical cable runs that led you to that number (i.e., show your work). Based on the total amount of wire and number of outlets you need, create a materials budget for the complete rewiring. This budget should include bulk wiring (1,000 ft rolls), RJ45 outlets, RJ 45 face plates, and patch panels. Indicate the sources of your information.
Please upload a sample of this using the photos i provided, and I will make my own version 

1060 1059 1048 1047 1055 1052 1064 1065 1042 1043 1005 1036 T DOOD 1041 1066 1008 1010 1009 10091 1002 1037 | 1038 phoaj 1004 1017 2014 1012 1024 YOU ARE HERE N TEELIEFindly 2003 2002 | HE , atu0000 DUITTO www. \u1qual GALICIAL WE GGE HEGG GOK | 2134 2099 2065 21 Naada Itdos osko 108 1]E (moslus | Karaok1 YOU ARE HERE E 1060 1059 1048 1047 1055 1052 1064 1065 1042 1043 1005 1036 T DOOD 1041 1066 1008 1010 1009 10091 1002 1037 | 1038 phoaj 1004 1017 2014 1012 1024 YOU ARE HERE N TEELIEFindly 2003 2002 | HE , atu0000 DUITTO www. \u1qual GALICIAL WE GGE HEGG GOK | 2134 2099 2065 21 Naada Itdos osko 108 1]E (moslus | Karaok1 YOU ARE HERE E
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts