Question: I need help within 2 hours pleaseee Q3. Motion analyses of two works of interest have the detail as given. Answer each question. 3.1 What

I need help within 2 hours pleaseee Q3. MotionI need help within 2 hours pleaseee

Q3. Motion analyses of two works of interest have the detail as given. Answer each question. 3.1 What is the standard time (second piece) of below work? LH description Code Tmu Code RH description 1. Motion 1 GA45 3.1.1)..... GB80 1. Motion 1 2. Motion 2 PC45 3.1.2).... PC30 2. Motion 2 3. Motion 3 A 3.1.3).... A 3. Motion 3 4. Motion 4 PA15 3.1.4).... 4. Idle 3.2 Write the code of the questioning motion. What should be the observed time of motion no. 1 of right hand if the speed of hand move likes card deal at 60 cards/30 seconds. Tmu LH description Code 1. Get PVC thread at 35 cm. distance apart 2. Align PVC thread with PVC joint (35 cm. distance apart) 3. Compress PVC thread with 3.2.3) PVC joint 4. Dispose part in Tray at 50 cm. 3.2.4) distance apart Code RH description 3.2.1) 1. Get PVC joint at 35 cm. distance apart 3.2.2)..... 2. Align PVC joint with PVC thread (35 cm. distance apart) 3. Hold PVC joint 4. idle OD = 15 mm joint ID = 15.1 mm thread Q4. XXX Company, a worker is assigned to operate several machines. The following information contains data from time study and some operating cost data. Loading time 0.5 minute Unloading time 0.5 minute How many machines should be Walk time between 2 machines assigned to one worker? And What 0.5 minute will be the production rate of this Worker rate 35 THB/hr work? Machine rate 20 THB/hr Machine run time 4 minute Q5. One production line has three stations. Their standard times (min/pc) are given in the table. Let there be 8 hours / 1 working day including 20 minutes break. This production line can serve the customer order of 300 pcs in 3 day or not. station Standard time (min/pc) P 4.4 Q 4.3 R 4.8 Q3. Motion analyses of two works of interest have the detail as given. Answer each question. 3.1 What is the standard time (second piece) of below work? LH description Code Tmu Code RH description 1. Motion 1 GA45 3.1.1)..... GB80 1. Motion 1 2. Motion 2 PC45 3.1.2).... PC30 2. Motion 2 3. Motion 3 A 3.1.3).... A 3. Motion 3 4. Motion 4 PA15 3.1.4).... 4. Idle 3.2 Write the code of the questioning motion. What should be the observed time of motion no. 1 of right hand if the speed of hand move likes card deal at 60 cards/30 seconds. Tmu LH description Code 1. Get PVC thread at 35 cm. distance apart 2. Align PVC thread with PVC joint (35 cm. distance apart) 3. Compress PVC thread with 3.2.3) PVC joint 4. Dispose part in Tray at 50 cm. 3.2.4) distance apart Code RH description 3.2.1) 1. Get PVC joint at 35 cm. distance apart 3.2.2)..... 2. Align PVC joint with PVC thread (35 cm. distance apart) 3. Hold PVC joint 4. idle OD = 15 mm joint ID = 15.1 mm thread Q4. XXX Company, a worker is assigned to operate several machines. The following information contains data from time study and some operating cost data. Loading time 0.5 minute Unloading time 0.5 minute How many machines should be Walk time between 2 machines assigned to one worker? And What 0.5 minute will be the production rate of this Worker rate 35 THB/hr work? Machine rate 20 THB/hr Machine run time 4 minute Q5. One production line has three stations. Their standard times (min/pc) are given in the table. Let there be 8 hours / 1 working day including 20 minutes break. This production line can serve the customer order of 300 pcs in 3 day or not. station Standard time (min/pc) P 4.4 Q 4.3 R 4.8

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!