Question: I need spring, clamp, handle, casting and shaft. As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material

I need spring, clamp, handle, casting and shaft.
As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 2 springs, and 3 clamps. The base is assembled from 2 clamps and 1 housing. Each clamp has 1 handle and 2 castings. Each housing has 2 bearings and 1 shaft. There is no inventory on hand. This exercise contains only parts b and c. The product structure is as follows: b) Determine the gross quantities needed of each item if you are to assemble 50 brackets. Base: units (enter your response as a whole number). Spring: units (enter your response as a whole number). Clamp: units (enter your response as a whole number). Housing: units (enter your response as a whole number). Handle: units (enter your response as a whole number). Casting: units (enter your response as a whole number). Bearing: units (enter your response as a whole number). Shaft: units (enter your response as a whole number)Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock