Question: i need these two columns to be filled out and preform the pert analysis Rules 8 o 2 optimistic Time likely mast OVE pessimet ar

i need these two columns to be filled out and preform the pert analysis i need these two columns to be filled out and
i need these two columns to be filled out and
i need these two columns to be filled out and
Rules 8 o 2 optimistic Time likely mast OVE pessimet ar Activity Time m Expected time A 9 1.5 2.5 3 9.5 5 3 C 1.5 9 d 2 1.5 4 2 e 0.5 U9 3 3.5 7 C5 UN 2.5 3.5 6 12 10 15 I 1 5 5.5 8 J ND 1.5 9.5 3 k 7 7 7.5 9 - L 1.5 9.5 4 3 3.5 5 3 2 3 4 0.5 12 members. 3. Perform a PERT Analysis assuming reasonable optimistic, most likely and pessimistic times for each activity from milestone 1. 4. Perform a crashing analysis assuming reasonable crashing costs and normal costs for each OLI 2 Activity G.D ; Predecessor

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!