Question: I put some background information, I need to answer the Yellow EMPTY Boxes! thank you in advanced. Fixed and Variable Cost Determinations Unit Cost Calculations

I put some background information, I need to answer the Yellow EMPTY Boxes! thank you in advanced.

I put some background information, I need to answer the Yellow EMPTYBoxes! thank you in advanced. Fixed and Variable Cost Determinations Unit CostCalculations The projected cost of a lamp is calculated based upon theprojected increases or decreases to current costs. The present costs to manufactureone lamp are: $16.0000000 per lamp Lamp Kit: Direct Labor: Varable OverheadFixed Overhead: 2.0000000 per lamp (4 lamps/hr.) 2.0000000 per lamp 0.0000000 perlamp (based on normal capacity of 25,000 lamps) Cost per lamp: Expectedincreases for 20x2 When calculating projected increases round to TWO (S0.00) decimalplaces. 1. Material Costs are expected to increase by 2.50% 2. LaborCosts are expected to increase by 5.00%. 3. Variable Overhead is expected

Fixed and Variable Cost Determinations Unit Cost Calculations The projected cost of a lamp is calculated based upon the projected increases or decreases to current costs. The present costs to manufacture one lamp are: $16.0000000 per lamp Lamp Kit: Direct Labor: Varable Overhead Fixed Overhead: 2.0000000 per lamp (4 lamps/hr.) 2.0000000 per lamp 0.0000000 per lamp (based on normal capacity of 25,000 lamps) Cost per lamp: Expected increases for 20x2 When calculating projected increases round to TWO (S0.00) decimal places. 1. Material Costs are expected to increase by 2.50% 2. Labor Costs are expected to increase by 5.00%. 3. Variable Overhead is expected to increase by 5.50%. 4. Fixed Overhead is expected to increase to $300,000. 5. Fixed Administrative expenses are expected to increase to $54,000. 6. Variable selling expenses (measured on a per lamp basis) are expected to increase by 3.00%. 7. Fixed selling expenses are expected to be $35,000 in 20x2. 8. Variable administrative expenses (measured a per lamp basis) are expected to increase by 2.00%. On the following schedule develop the following figures: 1- 20x2 Projected Variable Manufacturing Unit Cost of a lamp. 2- 20x2 Projected Variable Unit Cost per lamp. 3- 20x2 Projected Fixed Costs

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!