Question: i try to solve it but in second table i couldnt contunue please be as quik as u can S2: 1441/1442, 2019/2020) IE 314 [Operations

i try to solve it but in second table i couldnt
i try to solve it but in second table i couldnti try to solve it but in second table i couldnt contunue
please be as quik as u can
S2: 1441/1442, 2019/2020) IE 314 [Operations Management 21, All Sections Take-home Assignment 1 Problem #1 A manufacturing facility is setup to manufacture A CD cabinet that has a product structure shown in the following figure. CD Cabinet Cabinet top Usage 1 Cabinet bottom Usage 1 LT-4 Cabinet top Usage 2 LT Cabinet side Usage 2 LT Shelf Usage 4 LT2 Shelf support Usage 16 LT=1 LTE Feet Usage 4 LT=4 Magnet Usage 1 LT2 Hinges Usage=2 Handle Usage 1 LT=3 Screws Usage 8 LT=1 Door catch Usage 1 LT=1 Screws Usage 2 The MPS of the CD cabinet is given in the following table. Week 1 2 3 4 5 6 7 8 9 Quantity 25 25 25 25 30 30 30 30 35 10 35 11 35 12 35 obat Reader DC 02 1E314 Material.... IE 314 Takehome A X The MPS of the CD cabinet is given in the following table. Week 1 2 3 4 5 6 7 8 9 Quantity 25 25 25 25 30 30 30 30 35 10 35 11 35 12 35 The data of the inventory file for 10 items of the CD cabinet and its subassemblies and components are given in the following table: Inventory On Scheduled Item Receipts Lot Size Rule hand a ntity week) 500 FOQ = 80 units FPQ (3 periods) CD Cabinet Cabinet Top Magnet Hinges (30,6) (300,5) Handle 60 (30,5) EPP = 100 FOQ, holding cost = 1 SR/unit/week, Ordering cost = 100 SR/order POQ Screws 300 (100,2) a) Construct the time-phased product structure for the CD cabinet b) Develop the MRP table (POR) for each of the six items. [2 marks] [S marks] S2: 1441/1442, 2019/2020) IE 314 [Operations Management 21, All Sections Take-home Assignment 1 Problem #1 A manufacturing facility is setup to manufacture A CD cabinet that has a product structure shown in the following figure. CD Cabinet Cabinet top Usage 1 Cabinet bottom Usage 1 LT-4 Cabinet top Usage 2 LT Cabinet side Usage 2 LT Shelf Usage 4 LT2 Shelf support Usage 16 LT=1 LTE Feet Usage 4 LT=4 Magnet Usage 1 LT2 Hinges Usage=2 Handle Usage 1 LT=3 Screws Usage 8 LT=1 Door catch Usage 1 LT=1 Screws Usage 2 The MPS of the CD cabinet is given in the following table. Week 1 2 3 4 5 6 7 8 9 Quantity 25 25 25 25 30 30 30 30 35 10 35 11 35 12 35 obat Reader DC 02 1E314 Material.... IE 314 Takehome A X The MPS of the CD cabinet is given in the following table. Week 1 2 3 4 5 6 7 8 9 Quantity 25 25 25 25 30 30 30 30 35 10 35 11 35 12 35 The data of the inventory file for 10 items of the CD cabinet and its subassemblies and components are given in the following table: Inventory On Scheduled Item Receipts Lot Size Rule hand a ntity week) 500 FOQ = 80 units FPQ (3 periods) CD Cabinet Cabinet Top Magnet Hinges (30,6) (300,5) Handle 60 (30,5) EPP = 100 FOQ, holding cost = 1 SR/unit/week, Ordering cost = 100 SR/order POQ Screws 300 (100,2) a) Construct the time-phased product structure for the CD cabinet b) Develop the MRP table (POR) for each of the six items. [2 marks] [S marks]

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!