Question: i want answer in 30 mins and correct answer thanks for your help A production line is to be designed for a job with three
i want answer in 30 mins and correct answer thanks for your help

A production line is to be designed for a job with three tasks. The task times are 0.3 minutes, 1.4 minutes, and 0.7 minutes. The minimum cycle time in minutes, is a. 24 minutes b. 1.4 minutes c. 0.3 minutes d. 0.7 minutes
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts