Question: I Want Work Break Down Structure(wbs) For Sephora Program like this Villa Project 1.1 Excavation 12 Backfilling Works 13 Concrete Works Works 1 4 Finishing
I Want Work Break Down Structure(wbs) For Sephora Program like this
Villa Project 1.1 Excavation 12 Backfilling Works 13 Concrete Works Works 1 4 Finishing Works 1.3.1 Ploin Concrete Works 1.3.2 RC Concrete Works 14.1 Block Works 1.42 Plaster Works 14.3 Painting Works
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock