Question: ID AON what is project completion time? (1) 31 (2) 29 (3) 20 (4) 25 - ID productivity The Dulac Box plant produces wooden packing

ID AON what is project completion time? (1) 31 (2) 29 (3) 20

(4) 25

- ID productivity The Dulac Box plant produces wooden packing boxes to be used in the local seafood industry. Current operations allow the company to make 500 boxes per day, in two 8-hour shifts (250 boxes per shift). The company has introduced some moderate changes in equipment, and conducted appropriate job training, so that production levels have risen to 350 boxes per shift. Labor costs average $15 per hour for each of the 5 full-time workers on each shift. Capital costs were previously $3,000 per day and rose to $3,200 per day with the equipment modifications. Energy costs were unchanged by the modifications, at $400 per day. What is the firm's multifactor productivity before the changes?

(1) 2.245 boxes per dollar

(2) 0.109 boxes per dollar

(3) 1.907 boxes per dollar

(4) 1.237 boxes per dollar

-IDF1 A forecaster trusts both "most recent data points" and "the middle data points" three times the "oldest data point" in a 3-point MA method (as discussed in the class). The weights that are used for the method are:

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!