Question: ID Task Name % Complete Duration Work Start Finish Predecessors Resource Names Cost Baseline Start Baseline Finish CV SV ACWP BCWP BCWS Baseline Cost EAC
| ID | Task Name | % Complete | Duration | Work | Start | Finish | Predecessors | Resource Names | Cost | Baseline Start | Baseline Finish | CV | SV | ACWP | BCWP | BCWS | Baseline Cost | EAC | Notes |
| 1 | Wellness Vendor Project | 24% | 232 days | 3,238.8 hrs | Tue 2/14/17 | Sun 12/31/17 | $234,124.00 | Tue 2/14/17 | Sun 12/31/17 | $0.00 | ($4,680.00) | $0.00 | $0.00 | $4,680.00 | $234,124.00 | $234,124.00 | |||
| 2 | Initiation | 89% | 24 days | 80 hrs | Thu 5/4/17 | Tue 6/6/17 | $7,680.00 | Thu 5/4/17 | Tue 6/6/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $7,680.00 | $7,680.00 | |||
| 3 | Budget dollar service request | 100% | 5 days | 40 hrs | Thu 5/4/17 | Wed 5/10/17 | IS Manager | $3,800.00 | Thu 5/4/17 | Wed 5/10/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $3,800.00 | $3,800.00 | ||
| 4 | Project Charter | 75% | 2 days | 16 hrs | Sat 6/3/17 | Tue 6/6/17 | Business Owner | $1,600.00 | Sat 6/3/17 | Tue 6/6/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $1,600.00 | $1,600.00 | ||
| 5 | Obtain Approvals | 80% | 3 days | 24 hrs | Fri 6/2/17 | Tue 6/6/17 | IS Manager | $2,280.00 | Fri 6/2/17 | Tue 6/6/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $2,280.00 | $2,280.00 | ||
| 6 | Planning | 87% | 41 days | 144 hrs | Sun 6/11/17 | Mon 8/7/17 | $10,440.00 | Sun 6/11/17 | Mon 8/7/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $10,440.00 | $10,440.00 | |||
| 7 | Project Plan | 100% | 8 days | 64 hrs | Sat 7/15/17 | Fri 8/4/17 | Project Manager | $4,800.00 | Sat 7/15/17 | Fri 8/4/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $4,800.00 | $4,800.00 | ||
| 8 | Resource allocation approvals | 75% | 4 days | 32 hrs | Sun 6/11/17 | Mon 8/7/17 | 7 | Project Manager | $2,400.00 | Sun 6/11/17 | Mon 8/7/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $2,400.00 | $2,400.00 | |
| 9 | Communication | 67% | 3 days | 48 hrs | Sat 7/29/17 | Wed 8/2/17 | $3,240.00 | Sat 7/29/17 | Wed 8/2/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $3,240.00 | $3,240.00 | |||
| 10 | Develop Communication Plan | 100% | 0 days | 0 hrs | Sat 7/29/17 | Sat 7/29/17 | Project Manager | $0.00 | Sat 7/29/17 | Sat 7/29/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 11 | Review/Approve Communication Plan | 67% | 3 days | 48 hrs | Mon 7/31/17 | Wed 8/2/17 | 10 | Project Manager,SME | $3,240.00 | Mon 7/31/17 | Wed 8/2/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $3,240.00 | $3,240.00 | |
| 12 | Project Kickoff | 100% | 1 day | 8 hrs | Fri 5/5/17 | Fri 5/5/17 | All stakeholders | $10.00 | Fri 5/5/17 | Fri 5/5/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $10.00 | $10.00 | ||
| 13 | Execution | 34% | 119 days | 2,771.6 hrs | Thu 7/13/17 | Fri 12/22/17 | $197,324.00 | Thu 7/13/17 | Fri 12/22/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $197,324.00 | $197,324.00 | |||
| 14 | Vendor Wellness DB Tables | 98% | 55 days | 424 hrs | Thu 8/10/17 | Tue 10/24/17 | $35,685.00 | Thu 8/10/17 | Tue 10/24/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $35,685.00 | $35,685.00 | |||
| 15 | Create Tables | 100% | 48 days | 368 hrs | Thu 8/10/17 | Fri 10/13/17 | $32,525.00 | Thu 8/10/17 | Fri 10/13/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $32,525.00 | $32,525.00 | |||
| 16 | Create/Modify vendor database tables | 100% | 41 days | 320 hrs | Thu 8/10/17 | Wed 10/4/17 | DBA1 | $28,810.00 | Thu 8/10/17 | Wed 10/4/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $28,810.00 | $28,810.00 | ||
| 17 | Promote tables to QA | 100% | 2 days | 16 hrs | Thu 10/12/17 | Fri 10/13/17 | 16 | DBA1 | $1,450.00 | Thu 10/12/17 | Fri 10/13/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $1,450.00 | $1,450.00 | |
| 18 | Validate tables | 100% | 2 days | 16 hrs | Thu 10/5/17 | Fri 10/6/17 | 17 | DBA1 | $1,450.00 | Thu 10/5/17 | Fri 10/6/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $1,450.00 | $1,450.00 | |
| 19 | UAT | 100% | 2 days | 16 hrs | Thu 10/5/17 | Fri 10/6/17 | 18 | Business Analyst | $815.00 | Thu 10/5/17 | Fri 10/6/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $815.00 | $815.00 | |
| 20 | Promote Tables to Production | 86% | 27 days | 56 hrs | Sat 9/16/17 | Tue 10/24/17 | $3,160.00 | Sat 9/16/17 | Tue 10/24/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $3,160.00 | $3,160.00 | |||
| 21 | Create production ticket SR# | 100% | 3 days | 24 hrs | Sat 9/16/17 | Wed 9/20/17 | Business Analyst | $1,215.00 | Sat 9/16/17 | Wed 9/20/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $1,215.00 | $1,215.00 | ||
| 22 | Deploy Tables | 100% | 1 day | 8 hrs | Thu 10/19/17 | Thu 10/19/17 | DBA1 | $730.00 | Thu 10/19/17 | Thu 10/19/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $730.00 | $730.00 | ||
| 23 | Validate Tables | 67% | 3 days | 24 hrs | Fri 10/20/17 | Tue 10/24/17 | 22 | Business Analyst | $1,215.00 | Fri 10/20/17 | Tue 10/24/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $1,215.00 | $1,215.00 | |
| 24 | Final Code Review-Module 1 | 100% | 27 days | 120 hrs | Thu 9/7/17 | Fri 10/13/17 | $9,215.00 | Thu 9/7/17 | Fri 10/13/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $9,215.00 | $9,215.00 | |||
| 25 | Module 1 code review | 100% | 21 days | 80 hrs | Thu 9/7/17 | Thu 10/5/17 | Developer | $7,200.00 | Thu 9/7/17 | Thu 10/5/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $7,200.00 | $7,200.00 | ||
| 26 | Validate data accuracy | 100% | 5 days | 40 hrs | Mon 10/9/17 | Fri 10/13/17 | Business Analyst | $2,015.00 | Mon 10/9/17 | Fri 10/13/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $2,015.00 | $2,015.00 | ||
| 27 | Final Code Review-Module 2 | 100% | 26 days | 115.6 hrs | Thu 9/7/17 | Thu 10/12/17 | $9,139.00 | Thu 9/7/17 | Thu 10/12/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $9,139.00 | $9,139.00 | |||
| 28 | Module 2 code review | 100% | 21 days | 83.6 hrs | Thu 9/7/17 | Thu 10/5/17 | Developer | $7,524.00 | Thu 9/7/17 | Thu 10/5/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $7,524.00 | $7,524.00 | ||
| 29 | Validate data accuracy | 100% | 4 days | 32 hrs | Mon 10/9/17 | Thu 10/12/17 | 28 | Business Analyst | $1,615.00 | Mon 10/9/17 | Thu 10/12/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $1,615.00 | $1,615.00 | |
| 30 | Final Code Review-Module 3 | 0% | 33 days | 128 hrs | Thu 10/5/17 | Fri 11/17/17 | $1,625.00 | Thu 10/5/17 | Fri 11/17/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $1,625.00 | $1,625.00 | Project BEHIND | ||
| 31 | Module 3 code review | 0% | 12 days | 96 hrs | Thu 10/5/17 | Fri 10/20/17 | All stakeholders | $10.00 | Thu 10/5/17 | Fri 10/20/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $10.00 | $10.00 | ||
| 32 | Validate data accuracy | 0% | 4 days | 32 hrs | Tue 11/14/17 | Fri 11/17/17 | 31 | Business Analyst | $1,615.00 | Tue 11/14/17 | Fri 11/17/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $1,615.00 | $1,615.00 | |
| 33 | Wellness Vendor Reporting | 0% | 119 days | 1,984 hrs | Thu 7/13/17 | Fri 12/22/17 | $141,660.00 | Thu 7/13/17 | Fri 12/22/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $141,660.00 | $141,660.00 | |||
| 34 | Requirements | 0% | 108 days | 640 hrs | Thu 7/13/17 | Thu 12/7/17 | $41,740.00 | Thu 7/13/17 | Thu 12/7/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $41,740.00 | $41,740.00 | |||
| 35 | Define Business Rules | 0% | 32 days | 256 hrs | Thu 7/13/17 | Thu 12/7/17 | Business Analyst,Project Manager | $16,675.00 | Thu 7/13/17 | Thu 12/7/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $16,675.00 | $16,675.00 | ||
| 36 | Data Mapping | 0% | 22 days | 176 hrs | Thu 9/28/17 | Thu 11/30/17 | Business Analyst,Project Manager | $11,475.00 | Thu 9/28/17 | Thu 11/30/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $11,475.00 | $11,475.00 | ||
| 37 | Report mockups | 0% | 8 days | 64 hrs | Tue 10/17/17 | Wed 11/29/17 | Business Analyst,Project Manager | $4,195.00 | Tue 10/17/17 | Wed 11/29/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $4,195.00 | $4,195.00 | ||
| 38 | Documentation and Current Mockup Layouts | 0% | 18 days | 144 hrs | Thu 10/19/17 | Fri 12/1/17 | Business Analyst,Project Manager | $9,395.00 | Thu 10/19/17 | Fri 12/1/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $9,395.00 | $9,395.00 | ||
| 39 | Requirements Approved | 0% | 2 days | 0 hrs | Sat 9/2/17 | Mon 9/4/17 | $0.00 | Sat 9/2/17 | Mon 9/4/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 40 | Report Development | 0% | 52 days | 1,344 hrs | Fri 10/13/17 | Fri 12/22/17 | $99,920.00 | Fri 10/13/17 | Fri 12/22/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $99,920.00 | $99,920.00 | |||
| 41 | Report file layout data mapping | 0% | 16 days | 128 hrs | Tue 10/31/17 | Wed 12/6/17 | Report Dev 1 | $11,520.00 | Tue 10/31/17 | Wed 12/6/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $11,520.00 | $11,520.00 | ||
| 42 | Report UAT | 0% | 8 days | 64 hrs | Wed 12/13/17 | Fri 12/22/17 | Report Dev 1 | $5,760.00 | Wed 12/13/17 | Fri 12/22/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $5,760.00 | $5,760.00 | ||
| 43 | Reports Approved by Business Owner/Vendor | 0% | 2 days | 32 hrs | Tue 12/5/17 | Wed 12/6/17 | IS Manager,Business Owner | $3,120.00 | Tue 12/5/17 | Wed 12/6/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $3,120.00 | $3,120.00 | ||
| 44 | QA | 0% | 50 days | 1,120 hrs | Fri 10/13/17 | Wed 12/20/17 | $79,520.00 | Fri 10/13/17 | Wed 12/20/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $79,520.00 | $79,520.00 | |||
| 45 | Test Case Creation | 0% | 22 days | 176 hrs | Fri 10/13/17 | Sat 11/11/17 | QA | $8,800.00 | Fri 10/13/17 | Sat 11/11/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $8,800.00 | $8,800.00 | ||
| 46 | Test Case Execution | 0% | 28 days | 224 hrs | Mon 11/13/17 | Wed 12/20/17 | 45 | QA | $11,200.00 | Mon 11/13/17 | Wed 12/20/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $11,200.00 | $11,200.00 | |
| 47 | Deploy Reports to Production | 0% | 2 days | 16 hrs | Fri 11/10/17 | Sat 11/11/17 | Developer | $1,440.00 | Fri 11/10/17 | Sat 11/11/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $1,440.00 | $1,440.00 | ||
| 48 | UAT | 0% | 27 days | 704 hrs | Sat 11/11/17 | Mon 12/18/17 | $58,080.00 | Sat 11/11/17 | Mon 12/18/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $58,080.00 | $58,080.00 | |||
| 49 | Testing Support | 0% | 8 days | 128 hrs | Sat 11/11/17 | Mon 12/18/17 | ETL Dev 1,Report Dev 1,ETL Dev 2,Report Dev 2 | $10,560.00 | Sat 11/11/17 | Mon 12/18/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $10,560.00 | $10,560.00 | ||
| 50 | Remediation | 0% | 4 days | 128 hrs | Fri 11/17/17 | Wed 11/22/17 | ETL Dev 1,Report Dev 1,ETL Dev 2,Report Dev 2 | $10,560.00 | Fri 11/17/17 | Wed 11/22/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $10,560.00 | $10,560.00 | ||
| 51 | Production Support | 0% | 14 days | 448 hrs | Thu 11/23/17 | Tue 12/12/17 | 50 | ETL Dev 1,ETL Dev 2,Report Dev 1,Report Dev 2 | $36,960.00 | Thu 11/23/17 | Tue 12/12/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $36,960.00 | $36,960.00 | |
| 52 | Oversight | 0% | 92 days | 147.2 hrs | Thu 7/13/17 | Wed 11/15/17 | $11,410.00 | Thu 7/13/17 | Wed 11/15/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $11,410.00 | $11,410.00 | |||
| 53 | Project Manager | 0% | 92 days | 73.6 hrs | Thu 7/13/17 | Wed 11/15/17 | Project Manager[10%] | $5,890.00 | Thu 7/13/17 | Wed 11/15/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $5,890.00 | $5,890.00 | ||
| 54 | Architect | 0% | 92 days | 73.6 hrs | Thu 7/13/17 | Wed 11/15/17 | Architect[10%] | $5,520.00 | Thu 7/13/17 | Wed 11/15/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $5,520.00 | $5,520.00 | ||
| 55 | Go-Live | 0% | 1 day | 8 hrs | Thu 12/21/17 | Thu 12/21/17 | $0.00 | Thu 12/21/17 | Thu 12/21/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 56 | Go-Live Milestone | 0% | 1 day | 0 hrs | Thu 12/21/17 | Thu 12/21/17 | $0.00 | Thu 12/21/17 | Thu 12/21/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 57 | Module Reports in Production- Go live | 0% | 1 day | 8 hrs | Thu 12/21/17 | Thu 12/21/17 | $0.00 | Thu 12/21/17 | Thu 12/21/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||
| 58 | Monitor and Control | 0% | 107 days | 48 hrs | Tue 2/14/17 | Thu 7/13/17 | $4,680.00 | Tue 2/14/17 | Thu 7/13/17 | $0.00 | ($4,680.00) | $0.00 | $0.00 | $4,680.00 | $4,680.00 | $4,680.00 | |||
| 59 | Support | 0% | 107 days | 48 hrs | Tue 2/14/17 | Thu 7/13/17 | $4,680.00 | Tue 2/14/17 | Thu 7/13/17 | $0.00 | ($4,680.00) | $0.00 | $0.00 | $4,680.00 | $4,680.00 | $4,680.00 | |||
| 60 | Define Support Process | 0% | 3 days | 24 hrs | Tue 2/14/17 | Thu 2/16/17 | IS Manager | $2,280.00 | Tue 2/14/17 | Thu 2/16/17 | $0.00 | ($2,280.00) | $0.00 | $0.00 | $2,280.00 | $2,280.00 | $2,280.00 | ||
| 61 | Review Support Process | 0% | 3 days | 24 hrs | Fri 2/17/17 | Tue 2/21/17 | 60 | Business Owner | $2,400.00 | Fri 2/17/17 | Tue 2/21/17 | $0.00 | ($2,400.00) | $0.00 | $0.00 | $2,400.00 | $2,400.00 | $2,400.00 | |
| 62 | Support Process Approved | 0% | 0 days | 0 hrs | Thu 7/13/17 | Thu 7/13/17 | IS Manager,Business Owner | $0.00 | Thu 7/13/17 | Thu 7/13/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| 63 | Closing | 0% | 4 days | 32 hrs | Wed 12/27/17 | Sun 12/31/17 | $2,580.00 | Wed 12/27/17 | Sun 12/31/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $2,580.00 | $2,580.00 | |||
| 64 | Lessons Learned | 0% | 4 days | 32 hrs | Wed 12/27/17 | Sun 12/31/17 | Project Manager | $2,580.00 | Wed 12/27/17 | Sun 12/31/17 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $2,580.00 | $2,580.00 |
I need some help using this my professor wants me to expand it and change the date to 11/2/15 using this
- Deliverables:
- Planning
- Create project plan
- Create change management plan
- Create communications plan
- System Design
- Create architecture
- Design vendor wellness database tables
- Design wellness vendor reporting
- Development
- Build servers
- Build database tables
- Build reports
- Create user documentation
- Testing
- Test servers
- Test database tables
- Test reports
- Test server connection to Teradata service.
- Deployment
- Launch system
- Planning
- Milestones:
- Initial project plan completed
- Project charter approved
- Program code delivered
- System testing completed
- User acceptance testing completed
- Go live delivered
- Post implementation audit completed
- Project acceptance sign-off completed
- Business and Technical Requirements framed in the following manner:
- The system needs the ability to automatically import data from third party vendors on a weekly and monthly basis, following a similar process:
- Vendor sends daily data input file for report analytics.
- The system sends weekly vendor output analytics file (summarization of weekly activities).
- Vendor evaluates information for approval on correctness of data output and provides additional files (if necessary)
- Users need the ability to generate reports (e.g. wellness vendor reports) based on third party data;
- Users need the ability to view and save reports in various formats (e.g. Excel 97-2003 (XLS), Portable Document Format (PDF), or Comma Separated Value (CSV));
- The system should support MS SQL Server 2008 R2 and Teradata 14 for the database servers
- The system should use SSRS deployment server for the reporting requirements
- The system should support MS Visual Studio 2008 Shell, SQL Server Business Intelligence Development Studio and SQL Server Management Studio for the development tools
- The system needs the ability to automatically import data from third party vendors on a weekly and monthly basis, following a similar process:
- Limits and Exclusions:
- No user changes will be implemented without going through change management process
- No updates to prior modules will be performed
- No new servers, beyond the ones specified in the technical requirements, will be deployed
The 7-2 assignment is another of the key assignments in this course. Examine closely the IT 625 Final Project Milestone Five Guidelines and Rubric. The requirement is for you to leverage what you learned with regards to creating project schedule, the CPM, and risk assessment techniques in order to deliver a Schedule Planning, Risk Planning, and Risk Control Report. For point A, you must submit a Microsoft Project file. For points B and C, you can submit table, a chart or an outline in Word or Excel.
To minimize confusion, when working on the project schedule, assume it is November 2, 2015 and you have just been hired as the new project manager on the Medical Informatics case.
- Project Schedule Planning: Using MS Project, develop a comprehensive project schedule plan outlining completion dates, tasks, and relevant milestones. You should include all relevant artifacts that pertain to scheduling aspects of the project plan. In your project schedule plan, you could consider:
- Tasks that must be completed before others may begin
- Tasks that can be done at the same time
- Durations of each task
- Planned vs. actual dates
- Project Risk Planning: Craft a plan for identifying and monitoring risk. In your plan, you could consider:
- The amount of uncertainty in the project and how to deal with it
- The threats of greatest concern
- How each threat should be dealt with
- Risk Control: Determine corrective actions and controls to deal with uncertainty and its impact on the project, based on your risk plan. Ideas to consider may include:
- Appropriate quantification of the risks (probability vs. impact)
- Contingency funding or time buffers in place to handle threat for now i need help with part 1 project scheduling planning
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts