Question: If 8 hour shift, 7 days a week with 3 to 4 employees, sold an average of 1100 dozen doughnuts per day stage 1: batching:
If 8 hour shift, 7 days a week with 3 to 4 employees, sold an average of 1100 dozen doughnuts per day stage 1: batching: took 2 mins to place ingredients in bowl size ranging from 2lb to over 20lb. each doughnut required 2oz of dough. stage 2: mixing: mixing process took 2.5 mins turned off automatically and store had 2 mixers. stage 3: production: extruding- the machine used 3 cutters at a rate of 18 extrusions per min. the machine made at a rate of 54 doughnuts per min. the set up took approximately 1.5 min frying - 90 sec glazing- 45 sec stage 4: customizing two doughnuts every 3.5 sec. the problem: noticed he was unable to make enough doughnuts to meet demand. he needs to fin a way to increase his capacity. one change can be to increase the batch size. the staff suggested there might be a way to keep the current bach and instead focus on improving some of the more manual steps or the extruder be modified to operate 6 cutters and increase the rate at which doughnuts could be extruded. Flow Diagram of proposed new process (if modified).
Step by Step Solution
3.48 Rating (171 Votes )
There are 3 Steps involved in it
What might be improved done to resolve the root cause The root cause of the problem is that the store is unable to make enough doughnuts to meet the demand which means that the current production capa... View full answer
Get step-by-step solutions from verified subject matter experts