Question: If activity levels are lower than expected, total costs should be lower than expected. variable variable and fixed fixed Incorrect Ifa iVi y 'e lbwe

If activity levels are lower than expected, total costs should be lower than expected. variable variable and fixed fixed
Incorrect Ifa iVi y 'e lbwe 'han exected, costs should be lower than expectecL riable Correct Answer variable