Question: If the predetermined overhead rate is 2 0 0 % of direct labor cost and if direct labor cost is estimated to be $ 5

If the predetermined overhead rate is 200% of direct labor cost and if direct labor cost is estimated to be $512,000, which of the following amounts is equal to $1,024,000?
actual overhead costs
overhead applied
total work in process
expected overhead costs
 If the predetermined overhead rate is 200% of direct labor cost