Question: im really confused on this hw assignment please show work, thank you! PN3020 now requires some preparation labor prior to product assembly. Given the information

PN3020 now requires some preparation labor prior to product assembly. Given the information above for capacity bill development, determine the required capacity for Work Center 400 if 1430 units of PN1000 (End-Product) needs to be produced. Enter your result in hours rounded to 1 decimal place, if annlirable PN3020 now requires some preparation labor prior to product assembly. Given the information above for capacity bill development, determine the required capacity for Work Center 400 if 1430 units of PN1000 (End-Product) needs to be produced. Enter your result in hours rounded to 1 decimal place, if applicable. Feedback Based on answering incorrectly Incorrect. Note from the BOM tree that 2 units of PN2001 is required for each PN1000, but 3 units of PN3020 is required for each PN2001. Therefore. 6 units of PN3020 is required for each unit of PN1000, and the unit capacity requirement is multiplied by 6 . for WC400 needs when referencing the end product (PN1000)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
