Question: In a Drum - Buffer - Rope system, the Rope : In a Drum - Buffer - Rope system, the Rope : ties the material

In a Drum- Buffer- Rope system, the Rope:
In a Drum- Buffer- Rope system, the Rope:
ties the material release schedule to match the schedule.
is the constraint that sets the pace of bottleneck.
is a safety stock of material.
is a non-constraint.