In a housing project the following sequence of events occurs. • At the start of the project (time zero), land is bought at $1,000,000 • Two months later, $100,000 is paid to the architect for preparing the design • In month 4, construction is started and the cost of construction (labor and material) is $150,000 per month • Every month, one house is built (a total of 12 houses); the first one is ready for sale in month 6 • During every month starting from month 8, one house is sold for a price of $150,000 each • After all of the houses are built and before all are sold, the cost of maintaining the site is $10,000 per month Draw the cash flow diagram.