Question: In a job-order costing system that is based on machine-hours, which of the following formulas is correct? Predetermined overhead rate = Actual manufacturing overhead Actual

In a job-order costing system that is based on machine-hours, which of the following formulas is correct? Predetermined overhead rate = Actual manufacturing overhead Actual machine-hours Predetermined overhead rate = Actual manufacturing overhead Estimated machine-hours Predetermined overhead rate = Estimated manufacturing overhead Estimated machine-hours Predetermined overhead rate = Estimated manufacturing overhead Actual machine-hours