Question: In a manufacturing facility, each machine malfunctions, on average, once every 90 minutes. The time between breakdowns is exponentially distributed. Mechanics are assigned to

In a manufacturing facility, each machine malfunctions, on average, once every 90 minutes. The time between breakdowns is exponentially distributed. Mechanics are assigned to reset a machine that malfunctions. The time to repair a machine is exponentially distributed with a mean of 15 min. Each mechanic costs $50/ hr to the company. Each hour that a machine is not working costs the company $500 in lost production. If there are 120 machines, and management has decided to assign them to m mechanics, how many mechanics must be hired?
Step by Step Solution
3.45 Rating (161 Votes )
There are 3 Steps involved in it
There are a number of ways to think about this problem One way is to think about it in terms of the ... View full answer