Question: In a road construction, the base course needs to be compacted to required standard. After compaction, the sample was tested in the laboratory. It is

In a road construction, the base course needs to be compacted to
required standard. After compaction, the sample was tested in the
laboratory. It is found that water content w=14.6%, specific
gravity Gs =2.81 and the unit weight =18.2kNm3
The specifications require that e0.80.
Has the compaction reached the standard? (g=9.81ms2)
In a road construction, the base course needs to

Step by Step Solution