Question: In a sample of35adults, the mean assembly time for a child's swing set was1.78hours with a standard deviation of0.71hours. The makers of the swing set

In a sample of35adults, the mean assembly time for a child's swing set was1.78hours with a standard deviation of0.71hours. The makers of the swing set claim the average assembly time is less than2hours. Test their claim at the0.10significance level.

Show your steps for calculating the P-value (be sure to use the methods taught in this course).

(a) What type of test is this? Choose a, b, or c

  1. This is a right-tailed test.
  2. This is a two-tailed test.
  3. This is a left-tailed test.

(b) Use software to get the P-value of the test statistic. Round to 4 decimal places. P-value =

(c) What is the conclusion regarding the null hypothesis? Choose a or b

  1. rejectH0
  2. fail to rejectH0

(d) Choose the appropriate concluding statement. Choose a, b, c, or d

  1. The data supports the claim that the mean assembly time is less than 2 hours.
  2. There is not enough data to support the claim that the mean assembly time is less than 2 hours.
  3. We reject the claim that the mean assembly time is less than 2 hours.
  4. We have proven that that the mean assembly time is less than 2 hours.

WHAT IS THE FUCTION IN THE CALCULATOR Z-TEST, T-TEST,1-PROPZTEST

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!