Question: In a study, the time (measured or observed time) for a worker to do a job was measured as 5 minutes. The tempo of the

In a study, the time (measured or observed time) for a worker to do a job was measured as 5 minutes. The tempo of the worker was appreciated as 140% and the shares were estimated to be 5%. Calculate the standard time for the activity. Calculate how many pieces of work the worker will do in a working day. TZ=GZDSZ=TZ(1+)SQ=SZT
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
