Question: In a work center, Machine A has a 2 0 - minute set - up time per batch and a 2 - minute per unit
In a work center, Machine A has a minute setup time per batch and a minute per unit run time.Machine B performs the identical function but has a setup time of minutes and a minute run time per unit. The work center makes products in batches ranging from unit to units. Assuming capacity is not a limitation on either Machine, in order to minimize the total processing time, on which batches should Machine B be used? Batches of more than units should run on Machine B Batches can be run on either machines since they all have the same breakeven points Batches of more than units should be run on Machine B All batches should be run on Machine B since it has the shortest run time per unit Batches with up to units should be run on Machine B
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
