Question: In an MRP system, the minimum planning horizon Question 1 2 options: is the minimum amount of time needed to produce an end item if
In an MRP system, the minimum planning horizon
Question options:
is the minimum amount of time needed to produce an end item if there are no end itemscomponents in stock.
is equal to the sum of all the lead times of all components.
is equal to the length of time it takes to assemble the lowest level component.
is equal to the number of levels in the bill of materials multiplied by the lead time associated with assembling the end item.
is the sum of forecasted end item demand over the next ten weeks.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
