Question: In computing state plane coordinates for a project area whose mean orthometric height is 8 4 4 . 4 7 sft , an average scale

In computing state plane coordinates for a project
area whose mean orthometric height is 844.47 sft , an
average scale factor of 0.99998377 was used. The
average geoid height for the area is -32.484 m . The
given distances between points in this project area
were computed from SPCS 83 state plane
coordinates. (Use 6,371,000 m for an average radius
for the Earth.)
What horizontal length would have to be observed to lay off a 565.79 sftsft line on the grid?
Express your answer in survey feet to five significant figures.
What horizontal length would have to be observed to lay off a 268.054 mm line on the grid?
Express your answer in meters to six significant figures.
What horizontal length would have to be observed to lay off a 2441.25 sftsft line on the grid?
Express your answer is survey feet to six significant figures.
In computing state plane coordinates for a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!