Question: In Example 2 . 7 , suppose 1 1 machines are to be assigned. Which of the following assignments will minimize the total cost over

In Example 2.7, suppose 11 machines are to be assigned. Which of the following assignments will minimize the total cost over a common time period: {2,2,2,2,3} or {2,2,2,2,2,1}? Is there another combination that will be less expensive?
PRODUCT, PROCESS, AND SCHEDULE DESIGN
Figure 2.18 Multiple activity chart for Example 2.5.
Excluding idle time, each machine cycle requires a+t minutes to complete a cycle.
Likewise, the operator devotes a+b minutes to each machine during a cycle. Hence, an
ideal assignment is
n'=a+ta+b
For the example, a equals two minutes, b equals one minute, and t equals six minutes.
Therefore, n' equals 2.67 machines.
Since a fractional number of machines cannot be assigned to an operator, consider
what will happen if some integer number of machines, m, is assigned. The work content
 In Example 2.7, suppose 11 machines are to be assigned. Which

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!