Question: In the week 4 case study we discussed the potential reliability of a meteorology telemetry system being designed by the New Products section of Electrosystems.

In the week 4 case study we discussed the

In the week 4 case study we discussed the potential reliability of a meteorology telemetry system being designed by the New Products section of Electrosystems. Let's assume they won the contract and installed 10 systems. After 5 years of operation, they conduct a review of the performance of these systems. The first unit failed at 6 months, the 2nd at 12 months, the 3rd at 30 months and the 4th at 40 months. The remaining units survived the 5 years of operation. Units that failed were not replaced. Calculate the failure rate of the system in failure rate per million hours Selected Answer: [None Given] Correct Answer: 12.2

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!