Question: In this task, you are asked to formulate the linear programming problem below. You are not required to solve it. A sub-contractor produces two types
In this task, you are asked to formulate the linear programming problem below.
You are not required to solve it.
A sub-contractor produces two types of units for a kitchen manufacturer, a base
unit (B) and cabinet unit (C).
The base unit requires 40 minutes in the production department and 30 minutes in
the assembly department.
The cabinet unit requires 15 minutes in the production department and 25 minutes
in the assembly department.
The production and assembly of these two units are done by specialist carpenters
who are in short supply. Each day only 14 hours in the production department are
available and only 8 hours are available in the assembly department.
Once sold, the base units contribute 18 to profit and the cabinet units 32 to
profit.
Required:
Formulate the Linear Programming problem above by defining the control
variables, stating the object function and the two constraints.