Question: In time - and - material pricing, the charge for a particular job is the sum of the lbbor charge and the materials charge the
In timeandmaterial pricing, the charge for a particular job is the sum of the lbbor charge and the
materials charge the material loading charge.
materials charge desired profit.
material loading charge.
materials charge.