Question: In what design phase does the architect prepare a preliminary review of the owner's program, schedule, budget, site, proposed delivery method and other initial information
In what design phase does the architect prepare a preliminary review of the owner's program, schedule, budget, site, proposed delivery method and other initial information to determine the project requirements?
a Schematic design phase
b Design development phase
c Construction documents phase
d Procurement phase
This contract requires the architect to provide services in which phases of the facility life cycle?
a Conceptual design phase, schematic design phase, design development phase, and construction documents.
b Schematic design phase, design development phase, construction documents, and procurement.
c Schematic design phase, design development phase, construction documents, and construction.
d Schematic design phase, design development phase, construction documents, procurement and construction.
The architect review shop drawings and submittals to approve of the construction means, method, techniques and procedures. T or
During which phase does the architect assist the owner in developing bid documents?
a Schematic design phase
b Design development phase
c Construction documents phase
d Procurement phase
Who is responsible for coordination of the Owner's consultants?
a Architect
b Engineer
c ContractorConstruction Manager
d Owner
After design completion, the Owner is deemed the owner of the drawings, specifications and other instruments of service which were prepared by the Architect. T or F
What is the first method used to resolve disputes between the Architect and Owner?
a Litigation
b Arbitration
c Mediation
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock