Question: Include the specification of the project 2 here. Design 2 km long and 14 meters wide two-way urban road (flexible pavement) which will connect to

Include the specification of the project 2 here. Design 2 km long and 14 meters wide two-way urban road (flexible pavement) which will connect to a main road. The pavement materials should be asphalting concrete (bitumen bound aggregate), on surface layer and good quality materials in base, subbase, and subgrade layers. Documentation/data List all the documentation/data that you can access for the project and provide a brief description of each. Check that each documentation/data is current and accurate. Legislation and policies and procedures Outline the legislation, and policies and procedures that applies to your work in managing civil works design. Make sure you refer to WHS legislation. Include at least two legislation and two policies and procedures. Risk management Outline the risks that could apply to this project (include at least two) and associated control measures. Client requirements Based on your review of the documentation above, provide a summary of the client requirements for the project and the work you need to complete. Has all the information been provided such that a design can be developed? This includes detailed specifications and development and implementation factors. If not, what are the gaps? Environmental impacts Provide a summary of the potential environmental

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!