Question: INDUSTRIAL ENGINEERING: PREPARE A PROPOSAL IN SETTING UP THE FABRICATION PLANT FOR HYDRO CYCLONE FOR WASTE-WATER TREATMENT 1. HYDROCYCLONE WASTE-WATER SYSTEM PRODUCT DEVELOPMENT THE PRODUCT

INDUSTRIAL ENGINEERING: PREPARE A PROPOSAL IN SETTING UP THE FABRICATION PLANT FOR HYDRO CYCLONE FOR WASTE-WATER TREATMENT

1. HYDROCYCLONE WASTE-WATER SYSTEM PRODUCT DEVELOPMENT THE PRODUCT DEVELOPMENT SHALL INCLUDE:

i. QUALITY FUNCTION DEPLOYMENT

ii. MANUFACTURABILITY, VALUE ANALYSIS, AND VALUE ENGINEERING

iii. PRODUCT LIFE CYCLE MANAGEMENT

2. PROJECT MANAGEMENT

i. PROVIDE THE PROJECT PLANNING, SCHEDULING, AND CONTROLLING.

ii. PROJECT MANAGEMENT TECHNIQUES USING PERT AND CPM FOR THE ASSEMBLY WORK RELATED TO PARENT AND CHILD PARTS.

iii. THE PROPER OPERATION MANAGEMENT STRUCTURE IN FULFILLING THE ORGANIZATION NEEDS.

NOTE: USE RELEVANT DATA FROM ANY SOURCE

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!