Question: INDUSTRIAL ENGINEERING: PREPARE A PROPOSAL IN SETTING UP THE FABRICATION PLANT FOR HYDRO CYCLONE FOR WASTE-WATER TREATMENT 1. HYDROCYCLONE WASTE-WATER SYSTEM PRODUCT DEVELOPMENT THE PRODUCT
INDUSTRIAL ENGINEERING: PREPARE A PROPOSAL IN SETTING UP THE FABRICATION PLANT FOR HYDRO CYCLONE FOR WASTE-WATER TREATMENT
1. HYDROCYCLONE WASTE-WATER SYSTEM PRODUCT DEVELOPMENT THE PRODUCT DEVELOPMENT SHALL INCLUDE:
i. QUALITY FUNCTION DEPLOYMENT
ii. MANUFACTURABILITY, VALUE ANALYSIS, AND VALUE ENGINEERING
iii. PRODUCT LIFE CYCLE MANAGEMENT
2. PROJECT MANAGEMENT
i. PROVIDE THE PROJECT PLANNING, SCHEDULING, AND CONTROLLING.
ii. PROJECT MANAGEMENT TECHNIQUES USING PERT AND CPM FOR THE ASSEMBLY WORK RELATED TO PARENT AND CHILD PARTS.
iii. THE PROPER OPERATION MANAGEMENT STRUCTURE IN FULFILLING THE ORGANIZATION NEEDS.
NOTE: USE RELEVANT DATA FROM ANY SOURCE
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
