Question: Industrial Engineering Question! Below is the problem: 15 pts. The time study data for a job with five (5) elements studied for 5 cycles are

Industrial Engineering Question! Below is the problem: Industrial Engineering Question! Below is the
15 pts. The time study data for a job with five (5) elements studied for 5 cycles are shown on the table. Complete the missing data on the table and answer the questions that follow. JOB ELEMENT Cycle, Observed Time (minutes) Fundamental Performance Factor NT (minutes) Code Motion Time 1 Type 5 2 3 4 Manual 6 1688 7 6.85 Manual 11 12 11 16 Manual 3 2 3.5 5 4 Machine 10 11 10.5 10 11 E Manual 1 3 3 2 1 2.50 A B 14 D a. What is the normal time (in hours) of the job? Show your solutions and write your answers on the space provided b. What is the standard time in hours) of the job, given 5% allowance as a fraction of shift time? Show your solutions and write your answers on the space provided. 15 pts. The time study data for a job with five (5) elements studied for 5 cycles are shown on the table. Complete the missing data on the table and answer the questions that follow. JOB ELEMENT Cycle, Observed Time (minutes) Fundamental Performance Factor NT (minutes) Code Motion Time 1 Type 5 2 3 4 Manual 6 1688 7 6.85 Manual 11 12 11 16 Manual 3 2 3.5 5 4 Machine 10 11 10.5 10 11 E Manual 1 3 3 2 1 2.50 A B 14 D a. What is the normal time (in hours) of the job? Show your solutions and write your answers on the space provided b. What is the standard time in hours) of the job, given 5% allowance as a fraction of shift time? Show your solutions and write your answers on the space provided

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!