Question: Industrial engineers in a shoe factory locating in Topkapi, implement time study analysis to increase productivity of one of the work stations. At the
Industrial engineers in a shoe factory locating in Topkapi, implement time study analysis to increase productivity of one of the work stations. At the work station chosen as a pilot study, one of the operations composed of X,Y and Z tasks, is focused on. Observations are displayed below. The allowance time for this operation is determined as 7%. Based on these, compute normal times and standard time. Job Element X Y Z 1 7.55 7.45 6.05 Observations (Minutes) 2 3 7.40 7.55 7.80 8.00 6.15 6.00 4 5 8.15 8.10 8.05 5.45 7.55 5.55 Performance Ratings 95 85 115 n= e=z p(1-P) n NT = T(F)(RF) NTC = ST = NTC(1+1) 1
Step by Step Solution
There are 3 Steps involved in it
In order to compute the normal times and standard times for job elements X Y and Z we will follow these steps 1 Compute the average time for each job ... View full answer
Get step-by-step solutions from verified subject matter experts
