Question: information immediate and long - term deflections for the example presented in Tutorial 2 ( Tutorial 2 other applied loads. Tutorial 2 Background This example
information immediate and longterm deflections for the example presented in Tutorial Tutorial
other applied loads.
Tutorial
Background
This example is based on concrete bridge girders that were
designed, casted and tested up to failure as part of a linkage
project with the precast industry to study the economic and practical constraints of short production turnaround times, and
the competitiveness against steel girders. A solution was
and stiffness when releasing tensioning strands at an early age.
Tutorial
Background
The active reinforcement was composed of twelve in prestressing bonded strands at the bottom and two in strands were initially strands at the top. The pretensioning strands were initially stretched to MPa before the concrete was poured and were kept attached to the precast table until day At day the transfer took place and the posttensioning strands were stretched to MPc
The posttensioning strands were only installed to avoid premature failure due to the high level of stress applied by the pretensioning strands at such an early age. Once the girders are finally taken to a construction site to erect a bridge, the posttensioning strands are meant to be deal enough vertical load is applied to the structure.
Tutorial
Geometry
Tutorial
Tutorial
Calcul
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock