Question: Instructions: a ) You need to show your work. b ) If you assume something, you need to state that Problem 4 : Performance Evaluation
Instructions:
a You need to show your work.
b If you assume something, you need to state that
Problem : Performance Evaluation CPI
A pipeline with stages runs a program. Assume of instructions are branches, and branch not
taken holds for branch prediction. Further assume that percent of the branches are predicted
correctly, and there is an average penalty of cycles for each mispredicted branch. Additionally,
percent of the total instructions incur an average of stalls each.
What would be the CPI of running program P on this pipeline?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
