Question: Instructions: In this assignment you will create an RFI using MS Office. 20 Points 1. Revisit the sample project provided in Module 2 (Click here
Instructions: In this assignment you will create an RFI using MS Office. 20 Points
1. Revisit the sample project provided in Module 2 (Click here to download) and the sample RFI form provided here.
2. The question you will ask is the following: According to page 2 Typical Wall section Detail, we are only required to verify R-19 insulation is in place in the existing ceiling, is this correct? 5 pts
3. Date the RFI with the date it was created (in this case the date the assignment was uploaded to Canvas for grading)1pt
4. Name the subject of the RFI accordingly. 4pts
5. Propose a solution (for example: In order to meet current building code perhaps we should increase to R-30 batt insulation) 4pts
6. Take a snippet of the section detail and include it in the RFI form (Appendix page)
7. You may include an arrow pointing to the location in question for ease of finding to the Architect of Record (AOR) 3pts
8. You may include a text box below the snippet with the page number containing the detail for the architect's ease of reference. 3pts
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts